Royal Orchard Multan Bylaws: Construction Rules & Approval Process

  • 1 month ago
  • 0
Royal Orchard Multan Bylaws

If you own property in Royal Orchard Multan or plan to construct a residential/commercial building, understanding the society’s bylaws is crucial. This guide breaks down all key regulations—from plot restrictions to documentation requirements—ensuring a smooth approval process.


Why Compliance with Royal Orchard Bylaws Matters?

Royal Orchard Multan enforces strict construction bylaws to maintain:
✅ Urban aesthetics (uniform building designs)
✅ Safety standards (structural integrity, fire safety)
✅ Infrastructure protection (roads, utilities)
✅ Environmental sustainability (landscaping, solar energy)

Non-compliance leads to:
❌ Fines (e.g., Rs 5,000/month for late completion certificates)
❌ Demolition of unauthorized construction
❌ Utility disconnections


Key Sections of Royal Orchard Multan Bylaws

1. Plot Regulations

  • Corner Plots: 10% additional charges apply.
  • Sub-Division:
    • Residential: Allowed only for 1000 sq yd plots (divided into two 500 sq yd units).
    • CommercialNot permitted.
  • Amalgamation: Multiple plots can merge for construction but require re-approval if separated later.
  • Chamfering: Corner plots must have 5’x5’ (for <1 Kanal) or 10’x10’ (for ≥1 Kanal) tapering for traffic flow.

2. Mandatory Documents for Approval

Submit these with your BR forms (BR-1 to BR-12):

  • Ownership Proof: Ford-e-Malkiat, Aks Shajra, possession letter.
  • Technical Plans:
    • Structural drawings (signed by a registered architect).
    • Excavation, drainage, and landscape plans (required for 4+ Kanal plots).
    • Solar energy system design.
  • NOCs:
    • WASA (with paid bills), Civil Defense (fire safety), EPA (for high-rises).
    • Civil Aviation Authority (if near flight paths).

3. Construction Rules

  • Timeline:
    • Start within 3 years of plot possession.
    • Complete within 2 years of plan approval.
  • Inspections: Required at 4 stages:
    1. Basement excavation
    2. Plinth level
    3. Up to 38 ft height
    4. Above 38 ft
  • Penalties:
    • Rs 5,000/month for late completion certificates.
    • Demolition for unauthorized work.

4. Utility Connections

  • Water:
    • No private borewells/pumps (fines + confiscation).
    • Extra charges for swimming pools/lawns.
  • Sewerage:
    • Mandatory RCC septic tank before connecting to main lines.
    • Fines for illegal connections.
  • Electric/Gas: Obtain directly from providers.

5. Safety & Environmental Rules

  • Blasting: Prohibited.
  • Ventilation:
    • Minimum 8% window-to-floor area ratio.
    • Internal air wells required for kitchens/toilets (size varies by building height).
  • Landscaping: 4+ Kanal plots need tree plantations.

Step-by-Step Approval Process

  1. Prepare Documents: Ownership papers, BR forms, NOCs, and technical drawings.
  2. Submit Plans: 4 ammonia copies + 1 cloth copy to Building Control Department.
  3. Wait for Sanction: Approval/rejection within 45 days (deemed approved if no response).
  4. Begin Construction: Follow inspection stages.
  5. Obtain Completion Certificate: Submit final drawings within 30 days of construction end.

Pro Tips to Avoid Penalties

🔹 Hire Registered Professionals: Architects/engineers must sign plans.
🔹 No Deviations: Revised drawings needed for changes.
🔹 Clear Debris: Remove construction waste within 7 days of completion.
🔹 Pay Dues On Time: Delays incur fines (e.g., non-construction penalties).


Need Help? Contact Royal Orchard Multan