If you own property in Royal Orchard Multan or plan to construct a residential/commercial building, understanding the society’s bylaws is crucial. This guide breaks down all key regulations—from plot restrictions to documentation requirements—ensuring a smooth approval process.
Why Compliance with Royal Orchard Bylaws Matters?
Royal Orchard Multan enforces strict construction bylaws to maintain:
✅ Urban aesthetics (uniform building designs)
✅ Safety standards (structural integrity, fire safety)
✅ Infrastructure protection (roads, utilities)
✅ Environmental sustainability (landscaping, solar energy)
Non-compliance leads to:
❌ Fines (e.g., Rs 5,000/month for late completion certificates)
❌ Demolition of unauthorized construction
❌ Utility disconnections
Key Sections of Royal Orchard Multan Bylaws
1. Plot Regulations
- Corner Plots: 10% additional charges apply.
- Sub-Division:
- Residential: Allowed only for 1000 sq yd plots (divided into two 500 sq yd units).
- Commercial: Not permitted.
- Amalgamation: Multiple plots can merge for construction but require re-approval if separated later.
- Chamfering: Corner plots must have 5’x5’ (for <1 Kanal) or 10’x10’ (for ≥1 Kanal) tapering for traffic flow.
2. Mandatory Documents for Approval
Submit these with your BR forms (BR-1 to BR-12):
- Ownership Proof: Ford-e-Malkiat, Aks Shajra, possession letter.
- Technical Plans:
- Structural drawings (signed by a registered architect).
- Excavation, drainage, and landscape plans (required for 4+ Kanal plots).
- Solar energy system design.
- NOCs:
- WASA (with paid bills), Civil Defense (fire safety), EPA (for high-rises).
- Civil Aviation Authority (if near flight paths).
3. Construction Rules
- Timeline:
- Start within 3 years of plot possession.
- Complete within 2 years of plan approval.
- Inspections: Required at 4 stages:
- Basement excavation
- Plinth level
- Up to 38 ft height
- Above 38 ft
- Penalties:
- Rs 5,000/month for late completion certificates.
- Demolition for unauthorized work.
4. Utility Connections
- Water:
- No private borewells/pumps (fines + confiscation).
- Extra charges for swimming pools/lawns.
- Sewerage:
- Mandatory RCC septic tank before connecting to main lines.
- Fines for illegal connections.
- Electric/Gas: Obtain directly from providers.
5. Safety & Environmental Rules
- Blasting: Prohibited.
- Ventilation:
- Minimum 8% window-to-floor area ratio.
- Internal air wells required for kitchens/toilets (size varies by building height).
- Landscaping: 4+ Kanal plots need tree plantations.
Step-by-Step Approval Process
- Prepare Documents: Ownership papers, BR forms, NOCs, and technical drawings.
- Submit Plans: 4 ammonia copies + 1 cloth copy to Building Control Department.
- Wait for Sanction: Approval/rejection within 45 days (deemed approved if no response).
- Begin Construction: Follow inspection stages.
- Obtain Completion Certificate: Submit final drawings within 30 days of construction end.
Pro Tips to Avoid Penalties
🔹 Hire Registered Professionals: Architects/engineers must sign plans.
🔹 No Deviations: Revised drawings needed for changes.
🔹 Clear Debris: Remove construction waste within 7 days of completion.
🔹 Pay Dues On Time: Delays incur fines (e.g., non-construction penalties).