If you’re planning to construct a commercial building in Royal Orchard Multan, you must comply with the society’s bylaws and submit the required documents for approval. This guide provides a detailed checklist of all necessary paperwork, ensuring a smooth approval process.
Why Compliance Matters in Royal Orchard Multan?
Royal Orchard Multan enforces strict construction bylaws to maintain safety, aesthetics, and urban planning standards. Whether you’re building a shopping plaza, office complex, or multi-storey building, adhering to these regulations is mandatory.
Failing to submit the correct documents can lead to delays, fines, or even project rejection. To avoid complications, follow this step-by-step checklist.
Documents Required for Commercial Building Approval
1. Ownership & Land Verification
- Ford-e-Malkiat (Ownership deed)
- Aks Shajra (Land map)
2. BR Forms & Structural Certificates
- BR-1 to BR-5 (Basic construction forms)
- BR-6 (Structural Stability Certificate) – Must be signed by an M.Sc Structural Engineer
- BR-10 (Architect’s Undertaking)
- BR-11 (Structural Engineer’s Undertaking)
- BR-12 (Resident Engineer’s Undertaking)
3. Technical & Architectural Plans
- Structural Drawings (Prepared by a certified consultant)
- Excavation Plan
- Electrical & Plumbing Drawings (Detailed designs)
- Solar Energy System Design (Mandatory for sustainability compliance)
- Landscape Plan (Required for plots 4 Kanal or larger)
- Evacuation Plan (Must be approved by Civil Defense & 1122)
4. No Objection Certificates (NOCs)
- WASA NOC (With up-to-date paid bill)
- Fire Fighting NOC (From Civil Defense Department)
- Environment Protection Agency (EPA) NOC (For multi-storey/public buildings)
- TE & TP Department NOC (For buildings 5+ storeys or 4 Kanal plots)
- Civil Aviation Authority NOC (If near flight paths)
5. Additional Requirements
- Soil Investigation Report (If constructing basement parking)
- Building Safety Manager Appointment (For multi-storey buildings)
- Fresh Photographs of the Site
- Four Ammonia Copies + One Cloth Copy of building plans
Key Regulations to Remember
- Space Requirements: Ensure compliance with residential, commercial, and parking space allocations.
- Health & Safety: Follow Civil Defense and EPA guidelines for fire safety and environmental impact.
- Administrative Process: Submit all documents in the required format to avoid delays.
How to Submit Your Documents?
- Prepare all documents as per the checklist.
- Verify that NOCs and certificates are up-to-date.
- Submit to the Royal Orchard Multan administration office.
Need Help? Contact:
- UAN: +92 61 111 444 475
- Address: Gate #1, Multan Public School Road, Multan
Final Thoughts
Securing commercial building approval in Royal Orchard Multan requires careful preparation. By following this comprehensive checklist, you can avoid delays and ensure compliance with all regulations.